Mining
Mining crusher liner upgrade
Equipment: primary crusher liners
1,800 h
Service life before
5,200 h
Service life after
+189%
Improvement
1.1 / yr
Unplanned shutdowns
The Challenge
The primary crusher liners was wearing through after only 1,800 h of service, forcing repeated unplanned shutdowns and high spare-part consumption.
Our Solution
We rebuilt the original profile with Chromium Carbide Overlay Wear Plate, then re-zoned the wear face to match the measured abrasion pattern and verified hardness across every batch.
The Result
Service life reached 5,200 h — a +189% improvement — while unplanned shutdowns fell to 1.1 per year and wear cost per tonne dropped accordingly.