Power
Coal mill roll rebuild for a power plant
Equipment: coal mill grinding rolls
6,000 h
Service life before
14,000 h
Service life after
+133%
Improvement
0.4 / yr
Unplanned shutdowns
The Challenge
The coal mill grinding rolls was wearing through after only 6,000 h of service, forcing repeated unplanned shutdowns and high spare-part consumption.
Our Solution
We rebuilt the original profile with Hardfaced Grinding Rollers & Tables (New), then re-zoned the wear face to match the measured abrasion pattern and verified hardness across every batch.
The Result
Service life reached 14,000 h — a +133% improvement — while unplanned shutdowns fell to 0.4 per year and wear cost per tonne dropped accordingly.